Joy Condo Rail Safety Wall, Toronto ON

  • Our most recent retaining wall was a combination Green Terramesh® system and stone gabion.
  • At its highest it was 8m with a total length of 216m.
  • This wall wrapped around a condominium foundation on an industrial brownfield next to a CN line, offering many challenges to foundation works and coordinating shared access issues with other contractors.
  • Our team also installed a vibration barrier within the wall that is equal in height and length to the wall.
  • Scope of work also included foundation works and anchors for the large wooden fence that tops the wall.